CREWVARO
← All projects

Office VRF install — 3 floors

Lakefront Development Group · Toronto · starts 2027-02-05 · 5 weeks · 4 workers needed

VRF system for refit office. Equipment lead time 6 weeks — start date is firm.

$95,000 – $120,000

Trades needed: HVAC, Electrical

Pays hourly

Gap Finder — best matching crews

Scores are based on trade, availability, crew size, documents, reviews and pay preference. Paying members do not rank higher.

VoltEdge Electric Ltd. — 4 Electrical workers

★ 4.8(2 reviews)

Free from 2026-11-18 · Mississauga

Gap Finder match80%
  • ✓ Correct trade — Electrical
  • ! Not available on 2027-02-05 — free from 2026-11-18
  • ✓ 4-person crew covers your 4 workers needed
  • ✓ Insurance and WSIB on file
  • ✓ Rated 4.8 from 2 project-linked reviews
  • ✓ Pay fits — crew accepts hourly or piece work, project pays hourly

ClimatePro HVAC — 3 HVAC workers

★ 4.6(2 reviews)

Free from 2026-11-22 · Markham

Gap Finder match60%
  • ✓ Correct trade — HVAC
  • ! Not available on 2027-02-05 — free from 2026-11-22
  • ! Crew of 3 is short of your 4 workers needed
  • ✓ Insurance and WSIB on file
  • ✓ Rated 4.6 from 2 project-linked reviews
  • ! Pay mismatch — crew prefers piece work, project pays hourly

Applications (0)

No applications yet — be the first to apply.

Job reviews

Reviews are tied to this completed job only — one per direction. They open once the job is completed through Crewvaro.

No reviews yet — this job is still open.

Project Readiness50%
  • ✓ Drawings ready
  • ○ Materials on site
  • ✓ Site access arranged
  • ○ Previous trades complete
  • ✓ Permits in hand
  • ○ Work area ready

Apply to this project

Saving needs a Supabase project; in demo mode this reports that honestly.